MOT Perforated Pipe
- EMCO Waterworks

- May 30, 2024
- 1 min read
MOT spec perforated pipe. 6 rows of perforations per pipe, 6 inches spacing between holes. With 3 loads of pipes going out to customer’s site. That’s thousands of holes.


MOT spec perforated pipe. 6 rows of perforations per pipe, 6 inches spacing between holes. With 3 loads of pipes going out to customer’s site. That’s thousands of holes.

Comments